Saturday, July 11, 2009

Create a definite plan for carrying out your desire and begin at once, whether you are ready or not, to put this plan into action

Here's the basic plan. Seperate the project into several phases. Not all phase are defined here, but here is the general plan. I'll analye and refine the plan as I move forward. The plan is not date driven as there are too many variables in my life to adhere to data driven plans. However, my guestimate is this project will take about five years to complete given my current state of affairs.

Phase 1 - Disassembly
Phase 2 - Frame and Chassis Infrastucture
Phase 3 - Chassis and Suspension Build
Phase 4 - Body Components
Phase 5 - Braking
Phase 6 - Driveline
Phase 7 - Interior
Phase 8 - Disassembly and Paint
Phase 9 - Reassembly
Phase 10 - Drive!

Each of these phases will be laid out in more detail. However, Phase 1 is ready to go!

Most of the car had been previously disassembled. The engine had been removed 30 years ago, some interior components such as the seats, wheels and front suspension. Since the nose and front suspension was demolished in the accident, these were removed long ago.

I began by photographing what was left before disassembly. Here are some pics.


Here is a rear shot with the Fiberglass Deck Lid/Caps, shaved gas cap and 1966 Pontiac GTO taillights



The FiberFab Street E/T Nose



The FiberFab Street E/T Nose



Next, disassembly and evaluation of the shell.

Create a definite plan for carrying out your desire and begin at once, whether you are ready or not, to put this plan into action


Napolian Hill

No comments:

Post a Comment